Get a quote
Job guide

Scaffolding for roof repairs

Safe access to tiles, ridges, valleys and flashing.

Get a quote for this job

Almost every roof job that goes beyond a quick ladder fix needs scaffolding. Replacing slipped tiles, re-bedding a ridge, renewing lead flashing or re-roofing a whole slope all mean working at the eaves, and the Work at Height Regulations 2005 expect a roofer to use the safest practical access – which on a house is a scaffold with a boarded platform and edge protection.

A scaffold also speeds the job up. Materials go up in one lift instead of one bundle at a time, old tiles come down a chute instead of through the garden, and the roofer can keep working in poor weather once the edge protection is in place.

What scaffold set-up you need

  • For most repairs the scaffold runs along the elevation being worked on, with a working lift at eaves level and a double guardrail and toe board above the gutter line (roof edge protection).
  • For a full re-roof both slopes are usually scaffolded, often with a loading bay for pallets of tiles and battens.
  • Hipped roofs need the scaffold to turn the corners; a mid-terrace usually only needs the front or back.

How much does it cost?

Expect roughly the price of one or two elevations, plus £150–£300 for roof edge protection or a loading bay. A front-only scaffold on a two-storey semi is typically £650–£1,100 including four weeks’ hire in the South East, more in London.

For a guide price for your own home, use the scaffolding cost calculator or start a quote.

Tips

  • Ask your roofer whether their price already includes scaffolding – many add it at cost plus a margin, so a separate quote can save money.
  • Book the scaffold for the job length plus a week for weather.
  • If the job is on the back of a terrace with no side access, everything has to come through the house, which takes longer to erect.

Roof repairs: scaffolding FAQs

Can a roofer use a ladder instead?

For a short inspection or a single tile, sometimes. For anything longer, the law expects proper edge protection, which in practice means a scaffold or a roof edge system.

Do I need a licence?

Only if the scaffold stands on the pavement or road. Most roof scaffolds in front gardens or driveways need no licence.

Ready when you are

Get your scaffolding quote today

It takes about a minute. See your guide price now, then get firm quotes from local, insured scaffolders – free and with no obligation.

Get my exact quote Local experts. Real quotes. No hassle.